FcrPlanning
powerintegerrequired
Awarded FCR power in watts to be delivered during the scheduled period.
start_timestampintegerrequired
in Unix epoch (seconds).
stop_timestampintegerrequired
in Unix epoch (seconds).
enabledbooleanrequired
Whether the given planning should be enabled or disabled.
FcrPlanning
{
"power": 0,
"start_timestamp": 0,
"stop_timestamp": 0,
"enabled": true
}